Bi-Objective Optimization for an Integrated Facility Location and Disassembly Line Balancing Problem - Université d'Évry
Communication Dans Un Congrès Année : 2022

Bi-Objective Optimization for an Integrated Facility Location and Disassembly Line Balancing Problem

Peng Hu

Résumé

As an essential step during product recovery, disassembly has gained widespread attention with the growing awareness of sustainable development, and various problems around disassembly have been investigated. This paper integrates the facility location and disassembly line balancing problem to minimize the total cost as well as minimize the cycle time of the disassembly line. For the studied problem, a bi-objective mixed-integer programming model is formulated. Based on the problem properties, an epsilon-constraint method is proposed to solve the studied problem. Numerical experiments on an illustrative example and benchmark instances are conducted to demonstrate our proposed model and method.

Dates et versions

hal-03723059 , version 1 (13-07-2022)

Identifiants

Citer

Peng Hu, Feng Chu. Bi-Objective Optimization for an Integrated Facility Location and Disassembly Line Balancing Problem. 10th IFAC Conference on Manufacturing Modelling, Management and Control (MIM 2022), Jun 2022, Nantes, France. pp.1086--1091, ⟨10.1016/j.ifacol.2022.09.534⟩. ⟨hal-03723059⟩
67 Consultations
0 Téléchargements

Altmetric

Partager

More